BRUCE HWY UPGRADE
Date : 20/09/2022
Contractors : CPB
Rig : 17 Beretta
Objective: Install 4 x 110mm electrical piping underneath bruce hwy and a joining side road.
Started off the project using our Ditch witch but soon realized that the rock we encountered couldn’t be penetrated using this machine , Mobilize rig 17 to site with a 4” Hammer , set the mast at the correct level and drilled all 4 holes hitting the targets and pulling the 110mm PVC thru.